×
Facebook Twitter LinkedIn Google + YouTube

Canal and Drainage Rules

Topic Serial # Content Case Law
 

If more time than is covered

 
113 If more time than is covered by
 

A separate application

 
114 A separate application shall be made
 

The inspection of the records

 
115 The inspection of the records shall
 

No mark shall be name on any

 
116 No mark shall be name on any record or paper inspected
 

A separate register shall

 
117 A separate register shall be maintained in the
 

SCHEDULE I

 
 

APPROVED LIST OF FOODER CROPS

 
1 SCHEDULE I
 This is debug window. Set define('DEBUG', FALSE) in config.php file to hide it.